Looking to join a great company? We got you!

Search 1000's of jobs across various categories to find your dream job.


Post a job here with your requirements and we use all our channels to get you enough applicants to choose from.

Post a job For Free
<MMString:LoadString id="insertbar/linebreak" />

PSPCL Recruitment – Punjab State Power Corporation Limited

1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)
  • Company Name: Punjab State Power Corporation Limited
  • Experience: Freshers / Experienced
  • Job Location:
  • Eligibility:
  • Last Date: 12 May, 2017

Job Info : Punjab State Power Corporation Limited (PSPCL) invites application for the post of 1500 Assistant Lineman. Apply Online before 12 May 2017. Qualification/eligibility conditions, how to apply & other rules are given below…

Company Name : Punjab State Power Corporation Limited

Job Details :

Post Name : Assistant Lineman

No. of Vacancy : 1500 Posts

Pay Scale : Rs.6400-20200/-

Grade Pay : Rs.3400/-

Categories wise Vacancies :

  • General: 750 Posts
  • SC/ Mazbi/ Balmiki: 188 Posts
  • SC/ Others: 187 Posts
  • Backward Classes: 180 Posts
  • Ex Serviceman/ DXSM: 105 Posts
  • Physically Challenged: 45 Posts
  • Sports Person: 30 Posts
  • Freedom Fighters: 15 Posts

Qualification : Matriculation and 2 Years National Apprenticeship Certificate in Linerman Trade OR Degree/ Diploma in Electrical Engineering will be considered only if they have minimum qualifications (i.e. National Apprenticeship Certificate in Lineman Trade).

Location : Punjab

Experience : Freshers / Experienced.

Pay Scale : As Per Industry.

Age Limit : Minimum & Maximum age limit is 18 to 37 years as on 01.01.2017

Selection Process : Candidates will be selected based on merit. The merit will be made as per marks obtained in National Apprenticeship Certificate in Lineman trade.

Application Fee : Candidates have to pay Rs. 500/- (Rs. 450/- for Application fee + Rs. 50/- bank charges) for All Categories Except SC & PWD Candidates, Rs. 300/- (Rs. 250/- for Application fee & Rs. 50/- for Bank Charges) for PWD Candidates and Rs. 200/- (Rs. 150/- for Application Fee + Rs. 50/- for Bank Charges) for SC Candidates through challan should be deposited in any branch of SBOP now SBI.

How to Apply PSPCL Vacancy : Interested candidates may apply Online through the website www.pspcl.in from 17.04.2017 to 08.05.2017 (Step- I) and 16.05.2017 (Step- II).

Important Dates :

Last Date for Submit Online Application Form (Step- I) : 08.05.2017

Last Date for Submit Online Application Form (Step- II) : 16.05.2017

Click Here To Apply .

Company Profile

Punjab State Power Corporation Limited

PSPCL was incorporated as company on 16-04-2010 and was given the responsibility of operating and maintenance of State’s own generating projects and distribution system. The business of Generation of power of erstwhile PSEB was transferred to PSPCL.

All the power Stations operated at their best ever plant load factor since their installation. kdfsfds Net Power generated during 2008-09 is 37222 Million units, which is more than 2006-07 by 2238 Million Units resulting of 6.40% increase in two years. The 1980 MW (3×660) Talwandi Sabo Power Project awarded to M/s Sterlite Energy Ltd. Mumbai on 4.7.08 and PPA signed on 1.9.08. Power purchase agreement with M/S GVK for installing 2×270 MW thermal power station at Goindwal Sahib signed on 26 May 2009. The foundation stone has been laid and the company has started the construction.

4.76 lakh new connections including 61849 No. tubewell connections were released during 2007-09. 24 Hrs. Urban pattern supply made available to 12428 villages and 6158 Deras/ Dhanies with 5 or more houses. To help SC & BPL consumers, free monthly consumption up to 200 units allowed for connected load of 1000 watts w.e.f. 12-10-06 instead of earlier 500 watts. Strict measures have been taken to reduce power theft. Disciplinary action taken against the erring employees and 5 numbers Anti Power Theft Police Stations have been set up. New technologies like electronic meters, remote control of transformers, remote meter reading and HVDS system for AP/ Industries introduced. 20.29 lakh meters out of 55.98 lakh General/ Industrial Consumers shifted out of their premises as on 31.3.09 to curb theft of energy. All these measures have helped in reducing losses by 4% from 23.92% (2006–07) to 19.91% (2008–09) / which resulted in substantial increase in revenue. During 2007-09, 62 numbers New Grid substations erected and capacity at 132 number Grid substations augmented besides addition of 1070 circuit km. Transmission line and 149 MVAR shunt capacitors to State Grid.

View Site >>
Category in Govt Jobs | No Comments

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>